Wallsend Yard Facilities

...............................................................................................................................

NEMOC operates out of the old Swan Hunter Wallsend shipyard located on the North

bank of the river Tyne. The yard covers an area of 40 acres and incorporates spacious

outside erection areas, a specially built tidal basin, a heavy duty loadout quay for

structures of up to 10,000 tons in weight and boasts an impressive river frontage of

over 800 metres providing simultaneous berthing for several vessels at any one time.

 

A fabrication hall is available for construction of offshore structures and marine

equipment or to provide undercover storage for same. NEMOC also owns and

operates several heavy duty load-out trailers for moving equipment or structures of up

to 600 tons, enabling large structures to be transported to the quayside for offloading

onto seagoing vessels.

 















 

Home  | Services | Projects  | Contacts

NEMOC © 2008

 

Services


Engineering Management

NEMOC has extensive design office facilities with a team of engineers.


Wallsend Yard Facilities

NEMOC operates out of the old Swan Hunter Wallsend shipyard located on the North bank of the river Tyne.


Manpower Services

NEMOC maintains an extensive database of management, technical and skilled personnel.


NEMOC has a fleet of heavy duty low loader trailers for hire.


Other Services

Office Accomodomation and Decommissioning.


................................................................

.................................................................

You are viewing the text version of this site.

To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.

Need help? check the requirements page.

Get Flash Player